The country’s 11th ecological road bridge, under construction in Trabzon, will be completed by the end of 2025.
“This structure on the Black Sea coastal road is not just a crossing but a bridge to new life — a bridge that connects people and nature.”
“The eco-bridge under construction lies between the Ganita and Bazarkapı areas. It will be 250 metres long and 8 metres wide, with a 4-metre cycle path, a 2-metre footpath and 500 square metres of green space.”
“In total, 347 metres of cycle path (250 metres of it on the bridge) and 282 metres of footpath (250 metres on the bridge and 32 metres on natural ground) will be built.”
